About eon Building Design Construction Site Analysis Project Management Systems Analysis Software

Building Design Services - Site Analysis

Site Analysis whether for your own peace of mind or as a government or legislative requirement is one of the most important factors in the design of any new construction.

Whether you are looking at purchasing land for building or have obtained the land and are ready to start construction, contact us for peace of mind that the land you have selected is ready for construction.

We will consult with the local council or building authority to ensure we understand the requirements and impacts of construction on your property. We can conduct environmental and site analysis to gain insight into how construction should be managed and how the local ecology will benefit from the construction. When complete we present a Site Analysis Report outlining all the health, construction and environmental constraints for your selected property.

Site Analysis investigates the property you are working with and factors in:

  • How the construction impacts on the environment and local ecology.
  • Occupational Health and Safety requirements for the construction site.
  • Engineering requirements.
  • Council, legislative or government requirements placed on the land or surrounding areas, or
  • Providing environmentally conscious and ecologically effective alternatives and ideas.
  • a host of other factors that may influence the design and construction or approval process of your building or modification, including
    • Health
    • Water and water usage
    • Sewage and storm water
    • Dust and airborne contaminants
    • Noise and noise restrictions
    • Tress, tree removal and vegetation management


As an example:

The tree lined street, which was one of the main entry points into Wagga Wagga had local Government stipulation that the trees were to remain in place (undamaged) before, during and after construction.

In addition, with the scale of construction there were added restrictions on noise and airborne contaminants being released during the construction.

Eon Management Services effectively maintained the trees in their original condition and incorporated them into the new construction with minimal impact on the outlook and visual aesthetics of the final construction.

Eon Management Services not only keep the existing trees but also added to the overall look of the site through the addition of new plants and gardens that complimented the site and existing natural elements.

The trees incorporated into the final design now compliment the new construction and the clients stock and services. The design and site analysis conducted allowed Eon Management Services to maintain the natural aesthetics with minimal impact on the client's customers and the services the client provides.

By covering all these elements in our Site Analysis plan (if required) we provide a futuristic view of the property and minimise the impact of council/government requirements on your design and can cover off these requirements when submitting for building approval through our Site Analysis and Building plan.

  Privacy Statement  -    Contact Eon Management Services  -    Copyright & Disclaimer  -     ABN: